Got rid of waterboard and waterBoardJob. Reduced dikes to one dike. Added some files for Dikes operational (Timeseries calculator and DupuitCalculator. Only I doubt we want Dupuit (hence its strange location). Tom has to decide on that.Related to Issue [MWDAM-1031]
Mark tests for calculation with Category("Calculation"), so they can be excluded from the test run on Teamcity.They can be enabled, when the Dam engine is connectedRelated to Issue [MWDAM-1030]